Projektbeschreibung auf Englisch.
01 · Aufgabe
Modernise an existing geothermal heating system to raise efficiency, cut operating costs and meet growing capacity.
02 · Lösung
A thermal analysis revealed the bottlenecks; new pumps, valves and automation increased system performance by up to 30%.
03 · Ergebnis
Beyond new builds, we extend the life and efficiency of existing investments: sustainable engineering.
